红外探测器杜瓦结构的快启动优化
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Dewar of infrared detector start time optimization
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    某型号红外探测器组件在工程应用中需要极短的制冷启动时间,红外焦平面探测器组件的启动时间与制冷器的制冷性能和杜瓦冷头的热学性能相关。本文在不改变J-T制冷器状态的条件下,通过对杜瓦结构的冷屏、框架、冷台等零件的热负载设计优化仿真优化设计,减小冷头热质量,提高导热效率,有效减少了组件的制冷启动时间。

    Abstract:

    A certain type of IR FPA device needs very short cooling start-up time in engineering application,and the time is related to the cooling performance of J-T coolers and the thermodynamics performance of Dewars.In the paper,without changing the condition of the J-T cooler,through the optimization and simulation of thermal load design of Dewar structure parts such as cold shield,frame,cold table,et al,the thermal quality of the cooling head is reduced,the heat conduction efficiency is improved,and the cooling start-up time of the device is effectively reduced .

    参考文献
    相似文献
    引证文献
引用本文

李艳红,孟令伟,杜云章,付志凯.红外探测器杜瓦结构的快启动优化[J].激光与红外,2019,49(9):1080~1083
LI Yan-hong, MENG Ling-wei, DU Yun-zhang, Fu Zhi-kai. Dewar of infrared detector start time optimization[J]. LASER & INFRARED,2019,49(9):1080~1083

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2019-09-25
  • 出版日期: